BES Delivers Fusion Tower Air Conditioning Project Works

Fusion Tower Bristol

Located in the heart of Bristol, Fusion Tower provides bed spaces for 480 students. Originally a multi-tenanted office building with integral car parking, Fusion Tower has been transformed into a contemporary residential building including a cinema room, gym,  games room and breakout areas. The Fusion Tower building has achieved a BREEAM ‘Excellent’ grading through the high standards of the design following upgrades to the front of the building, including the installation of photovoltaic panels and planned future connection to the Bristol District heating plant.

Fusion Tower Air Conditioning Project

Fusion Tower Air Conditioning ProjectThe living accommodation has been constructed to include three to six bedroom studio flats, apartments and twin “two-dios” for those wishing to share.

Originally contracted by a new M+E client in 2015, BESL air conditioning contractors has undertaken a number of small installations on this project over the last 12 months. The initial contract involved installation of a Daikin twin split system to provide cooling to the newly installed gym, as well as a single split to provide essential cooling to a comms room.

Following completion of these original works and subsequent positive feedback from the client, BESL was given the contract to provide cooling to the games room and the small reception office. These additional works were due to the air conditioning requirement changes by the end user for additional cooling in these areas. Daikin air conditioning systems were used again for this work. The office has a wall mounted single split, the condenser being added next to the gym/comms condensers. The games room had a full glass façade on the front elevation and was suffering from excessive solar gain, so we instructed our design team to evaluate the required cooling load. We installed a wall mounted twin split system, with the condenser being located in the roof courtyard.

Following another successful installation, we have recently been awarded the works to provide cooling to the reception area in this building, with works to start on site in December, to complete before Christmas.

BES Air Conditioning Contractors

Fusion TowerBES Limited air conditioning installers are very proud of the way our onsite and office teams have worked closely with a new client to develop this new relationship whilst delivering a successful air conditioning installation project. To find out more about the Fusion Tower Bristol project, or any of the other air conditioning services we offer in the North West and across the rest of the UK,  just call Building Environmental Solutions Limited on 01942 590 494 now.

BESL 

Request A Free Site Survey

Click Here

Request A Quote / Site Survey
Please Give Us A Brief Overview Of Your Requirements So That We Can Send An Appropriate Engineer
  • Mitsubishi Electric


  • Safe Contractor

  • Daikin Air Conditioning Systems

Get in touch

BES Ltd

Phone

E-mail:

enquiries@beslimited.co.uk

Request A Callback